Tuas Desalination Plant 3 – Civil Package

  • Project Title: Tuas Desalination Plant 3 – Civil Package
  • Client: Public Utilities Board (PUB)
  • Main Contractor: HSL Constructor Pte Ltd
  • Location: Tuas Singapore
  • Year: 2016
  • Scope of work: 66kv Main Substation, Chlorine contact tank, RO process building, Clarification DAF building, Filtered water tank, RO flush Tank, North and south DAF substation, Lime Saturator Tank, Control Building, Guardhouse, Flow meter Chamber, Sprinkler water tank, Weighing Bridge, Electrical / Instrumentations cable duct bank including pits, product water pump station, intake building and pump station, intake substation, outfall building & substation, new retaining wall, K4 wall, perimeter Drainage system & manhole.